{"id":"SEC-09-025","kind":"order","level":"city","jurisdiction":"City of Boston","state":"MA","metro":"","industry":"09","agency":"","eco":"","issuer":"City of Boston (ISD / PWD)","authority":"Permit conditions; COVID-19 Safety Policy for Construction","instrument":"COVID-19 Safety Plan - Compliance Affidavit (with Construction Site Best Practices Worksheet, Exhibit A)","title":"Boston construction COVID-19 safety affidavit","dateIssued":"2020-04-27","effective":"2020-04-27 (required of all operating sites)","end":"","startDate":"2020-04-27","endDate":"2020-12-31","quarters":["2020Q2","2020Q3","2020Q4"],"types":["EMP"],"addressees":["every permittee/contractor on a City-permitted site and its subcontractors"],"clause":"The undersigned Permittee (\u0027Contractor\u0027) certifies the following under the pains and penalties of perjury... it will comply with the Commonwealth of Massachusetts COVID-19 Guidelines and Procedures for All Construction Sites and Workers at All Public Work... The Contractor agrees that the COVID-19 Safety Plan shall be in place and submitted to ISD or Public Works before any work may begin... non-compliance with any of the requirements above, including failure to abide by its own COVID-19 Safety Plan, may result in suspension or termination of work in progress or revocation of the City\u0027s permit for such work.","enforcement":"Suspension or termination of work; permit revocation; perjury","functions":["JS","PM","SB (each subcontractor certified)","OP"],"notes":"","sourceUrl":"https://www.boston.gov/sites/default/files/file/2020/04/Boston%27s%20COVID-19%20Affidavit%20for%20Construction%20Work%20-%20Final.pdf","snapshot":"https://web.archive.org/web/20200509000029/https://www.boston.gov/sites/default/files/file/2020/04/Boston%27s%20COVID-19%20Affidavit%20for%20Construction%20Work%20-%20Final.pdf","fileExists":true,"fileBytes":98139,"grade":"primary","character":"","description":"","collection":"SEC-09","url":"/library/SEC-09-025","exhibitUrl":"/exhibit/SEC-09-025","citation":"City of Boston (ISD / PWD), COVID-19 Safety Plan - Compliance Affidavit (with Construction Site Best Practices Worksheet, Exhibit A) (Apr. 27, 2020) (Ex. SEC-09-025)","stateName":"Massachusetts","related":[]}